Removal of bituminous residues contained in the subcritical deposits of the MA UP1 plant in Marcoule.
Client: ORANO DEM – CEA
2020-2021: (Consortium with DAHER)
- DAHER: Contractor, project management and assistance
- GDES: Operational and waste management, pumping and manual recovery of bituminous waste from dismantled buckets and tanks.
2022-2023: GDES contracted for the entire project
Completion of operational management. Dismantling of subcritical deposits, shielding of civil works and treatment of historical waste.
Milestones:
Project executed successfully despite the technical difficulties of the structures and interruptions due to the Covid-19 Pandemic.
Congratulation of the client and obtaining of the total contract of the project in its final phase.

Scope of the last phase:
-Pumping of bituminous residues in the AirLift (approx. 1m3) and its dismantling.
-Dismantling of subcritical deposits 7 and 8.
-Manual waste removal.
-Dismantling of retaining walls.
-Disassembly of the shielding of civil works.
-Waste treatment and management.