Coating system for the improvement of sealing and structural reinforcement for long-term operation of Nuclear Power Plants.
Added value and results:

The real capacity of our system (SIKAWRAP 230C.) to solve a new requirement not raised until now, and whose resolution guarantees the operation of NPPs under the most recent regulations of international nuclear safety.
Our operational capability to face complex projects under the requirements of NPPs , with the recognition of our client EDF for the successful results in the pressure tests at NPP Flamanville 1 (France).
Operational Experience:
•NPP Cattenom 3: 50 m2 (2016).
•NPP Flamanville 2: 2400 m2 (2017).
•NPP Flamanville 1: 4500 m2 (2018).
•NPP Flamanville 2: 3600m² (2019).


Highlights
- Specifically developed for EDF
- 4 different interventions.
- 10,500 m2of surface area were treated between 2016-2019.
- 200,000 man-hours have been accumulated in the four years of study, design, approval of the SIKAWRAP 230Csystem and execution of the works.
- This system, developed and approved by GDES, benefits from an exclusive agreement for application on all nuclear power plants owned by EDF.
- The excellent results together with our client’s commendation after the
pressure tests carried out on the Extrados project have positioned us
as a leading supplier of specialized and large-scale projects in surface treatments for the French nuclear sector.