Aportamos valor para proporcionar energia al mundo

UP1 MARCOULE

Removal of bituminous residues contained in the subcritical deposits of the MA UP1 plant in Marcoule.

Client: ORANO DEM – CEA

2020-2021: (Consortium with DAHER)

  • DAHER: Contractor, project management and assistance
  • GDES: Operational and waste management, pumping and manual recovery of bituminous waste from dismantled buckets and tanks.

2022-2023: GDES contracted for the entire project

Completion of operational management. Dismantling of subcritical deposits, shielding of civil works and treatment of historical waste.

Milestones:

Project executed successfully despite the technical difficulties of the structures and interruptions due to the Covid-19 Pandemic.

Congratulation of the client and obtaining of the total contract of the project in its final phase.

 

MARCOULE

Scope of the last phase:

-Pumping of bituminous residues in the AirLift (approx. 1m3) and its dismantling.

-Dismantling of subcritical deposits 7 and 8.

-Manual waste removal.

-Dismantling of retaining walls.

-Disassembly of the shielding of civil works.

-Waste treatment and management.