{"id":2226,"date":"2021-05-24T13:32:50","date_gmt":"2021-05-24T11:32:50","guid":{"rendered":"https:\/\/ingmark.com\/corporate\/?p=6643"},"modified":"2024-12-26T22:24:14","modified_gmt":"2024-12-26T21:24:14","slug":"gdes-participa-en-el-megaproyecto-de-energia-hidroelectrica-de-portugal","status":"publish","type":"post","link":"https:\/\/ingmark.com\/corporate\/en\/gdes-participa-en-el-megaproyecto-de-energia-hidroelectrica-de-portugal\/","title":{"rendered":"GDES to take part in the Portuguese hydropower megaproject"},"content":{"rendered":"<h4>The Valencia-based company will perform various coating operations at the hydroelectric complex that Iberdrola is building on the T\u00e2mega River.<\/h4>\n<p>GDES has been awarded a contract for the supply and application of surface protection <strong>coatings and paints<\/strong> at the three hydroelectric plants under construction for the power generation megaproject that Iberdrola is developing in the Alto T\u00e2mega area in northern <strong>Portugal<\/strong>. Work will be carried out over the three-year duration of the project.<\/p>\n<p><!--more--><\/p>\n<p>The project consists of a <strong>giga battery comprising three hydroelectric plants <\/strong>\u2013 Gouv\u00e3es, Daiv\u00f5es and Alto T\u00e2mega \u2013 with an installed capacity of 1,158 MW, increasing the total installed electrical power in the country by 6%. Construction is in its final stretch and the complex is expected to be fully operational by 2023.<\/p>\n<p>On this project, GDES will be responsible for the application of coatings and paints to various elements, equipment, floors, and walls, for <strong>anti-corrosion protection and concrete protection<\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Valencia-based company will perform various coating operations at the hydroelectric complex that Iberdrola is building on the T\u00e2mega River. GDES has been awarded a contract for the supply and application of surface protection coatings and paints at the three hydroelectric plants under construction for the power generation megaproject that Iberdrola is developing in the [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2228,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43,27],"tags":[],"class_list":["post-2226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-operativa","category-tratamiento-de-superficies"],"_links":{"self":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/2226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/comments?post=2226"}],"version-history":[{"count":2,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/2226\/revisions"}],"predecessor-version":[{"id":2230,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/2226\/revisions\/2230"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/media\/2228"}],"wp:attachment":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/media?parent=2226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/categories?post=2226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/tags?post=2226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}