{"id":3448,"date":"2000-06-18T13:49:23","date_gmt":"2000-06-18T11:49:23","guid":{"rendered":"https:\/\/ingmark.com\/corporate\/?p=3448"},"modified":"2025-07-15T12:24:35","modified_gmt":"2025-07-15T10:24:35","slug":"proyecto-extrados","status":"publish","type":"post","link":"https:\/\/ingmark.com\/corporate\/en\/proyecto-extrados\/","title":{"rendered":"EXTRADOS PROJECT"},"content":{"rendered":"<p><strong>Coating system for the improvement of sealing and structural reinforcement for long-term operation of Nuclear Power Plants.\u00a0<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><b>Added value and results<\/b>:\u200b<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-3451 alignleft\" src=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Extrados-GDES-2-172x300.png\" alt=\"\" width=\"172\" height=\"300\" srcset=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Extrados-GDES-2-172x300.png 172w, https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Extrados-GDES-2.png 221w\" sizes=\"(max-width: 172px) 100vw, 172px\" \/><\/p>\n<p>The real capacity of our system (<b>SIKAWRAP 230C<\/b>.) to solve a <b>new requirement not raised until now, and whose resolution guarantees the operation of NPPs<\/b> under the most recent regulations of international nuclear safety.\u00a0\u200b<\/p>\n<p>\u200b<\/p>\n<p><b>Our operational capability to face complex projects under the requirements of NPPs<\/b> , with the recognition of our client EDF for the <b>successful results<\/b> in\u00a0 the pressure tests at NPP Flamanville 1 (France).<\/p>\n<p><b>Operational Experience:\u00a0<\/b><\/p>\n<p>\u2022NPP\u00a0Cattenom 3: 50 m2 (2016).<br \/>\n\u2022NPP Flamanville 2: 2400 m2 (2017).<br \/>\n\u2022NPP Flamanville 1: 4500 m2 (2018).<\/p>\n<p>\u2022NPP\u00a0Flamanville\u00a02: 3600m\u00b2 (2019).<\/p>\n<p><b><img decoding=\"async\" class=\"size-medium wp-image-3450 alignright\" src=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Foto-extrados-cupula-300x269.png\" alt=\"\" width=\"300\" height=\"269\" srcset=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Foto-extrados-cupula-300x269.png 300w, https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Foto-extrados-cupula.png 395w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/b><\/p>\n<p><b><img decoding=\"async\" class=\"size-medium wp-image-3452 alignleft\" src=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Extrados-GDES-185x300.jpg\" alt=\"\" width=\"185\" height=\"300\" srcset=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Extrados-GDES-185x300.jpg 185w, https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/06\/Extrados-GDES.jpg 324w\" sizes=\"(max-width: 185px) 100vw, 185px\" \/><\/b><\/p>\n<p><b>Highlights<\/b><\/p>\n<ul>\n<li>Specifically developed for <b>EDF<\/b><\/li>\n<li><b>4 <\/b>different interventions.<\/li>\n<li><b>10,500 m2<\/b>of surface area were treated between 2016-2019.<\/li>\n<li><b>200,000 man-hours <\/b>have been accumulated in the four years of study, design, approval of the\u00a0<b>SIKAWRAP 230C<\/b>system and execution of the works.<\/li>\n<li>This system, developed and approved by GDES, benefits from an <b>exclusive agreement for application <\/b>on all nuclear power plants owned by EDF.<\/li>\n<li>The <b>excellent results <\/b>together with our client\u2019s commendation after the<br \/>\npressure tests carried out on the Extrados project have positioned us<br \/>\nas a leading supplier of specialized and large-scale projects in surface treatments for the French nuclear sector.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Coating system for the improvement of sealing and structural reinforcement for long-term operation of Nuclear Power Plants.\u00a0 &nbsp; Added value and results:\u200b The real capacity of our system (SIKAWRAP 230C.) to solve a new requirement not raised until now, and whose resolution guarantees the operation of NPPs under the most recent regulations of international nuclear [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":3449,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[56,53],"tags":[],"class_list":["post-3448","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyectos-tratamiento-superficies","category-proyectos-general"],"_links":{"self":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/3448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/comments?post=3448"}],"version-history":[{"count":8,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/3448\/revisions"}],"predecessor-version":[{"id":3455,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/3448\/revisions\/3455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/media\/3449"}],"wp:attachment":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/media?parent=3448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/categories?post=3448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/tags?post=3448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}