{"id":3797,"date":"2025-07-08T14:28:27","date_gmt":"2025-07-08T12:28:27","guid":{"rendered":"https:\/\/ingmark.com\/corporate\/fr\/?p=3797"},"modified":"2025-07-11T15:19:53","modified_gmt":"2025-07-11T13:19:53","slug":"robotised-metallisation","status":"publish","type":"post","link":"https:\/\/ingmark.com\/corporate\/en\/robotised-metallisation\/","title":{"rendered":"ROBOTISED METALLISATION"},"content":{"rendered":"<h2><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-3798 alignleft\" src=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/07\/tirant-web-300x200.webp\" alt=\"\" width=\"300\" height=\"200\" \/>Robotised Metallisation of Cross-Under (pipes) at the Laguna Verde Nuclear Power Station (Mexico)<\/h2>\n<p>During the 14th and 11th Refuelling of Units 1 and 2 at the Laguna Verde Nuclear Power Station (in the year 2010), the various activities necessary for the robotised metallisation of the Cross-Under pipes were carried out by using the TIRANT 3\u00ae<\/p>\n<p>&nbsp;<\/p>\n<p><b>Objectives:<\/b><\/p>\n<ul>\n<li>Metallising the Cross-Under pipes of both units by mean of our the Tirant3\u00ae system<\/li>\n<li>Full satisfaction of customer\u2019s specifications as for thickness, adherence, and porosity of the coating layers.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Robotised Metallisation of Cross-Under (pipes) at the Laguna Verde Nuclear Power Station (Mexico) During the 14th and 11th Refuelling of Units 1 and 2 at the Laguna Verde Nuclear Power Station (in the year 2010), the various activities necessary for the robotised metallisation of the Cross-Under pipes were carried out by using the TIRANT 3\u00ae [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":3799,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[53,55,56],"tags":[],"class_list":["post-3797","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyectos-general","category-proyectos-servicios-nucleares","category-proyectos-tratamiento-superficies"],"_links":{"self":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/3797","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/comments?post=3797"}],"version-history":[{"count":21,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/3797\/revisions"}],"predecessor-version":[{"id":4105,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/3797\/revisions\/4105"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/media\/3799"}],"wp:attachment":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/media?parent=3797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/categories?post=3797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/tags?post=3797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}