{"id":4140,"date":"2023-07-14T14:37:23","date_gmt":"2023-07-14T12:37:23","guid":{"rendered":"https:\/\/ingmark.com\/corporate\/?p=4140"},"modified":"2025-07-14T14:43:24","modified_gmt":"2025-07-14T12:43:24","slug":"almacen-cn-jose-cabrera-2005-2013","status":"publish","type":"post","link":"https:\/\/ingmark.com\/corporate\/en\/almacen-cn-jose-cabrera-2005-2013\/","title":{"rendered":"JOSE CABRERA NPP STORAGE FACILITY (2005-2013)"},"content":{"rendered":"<ul>\n<li>Metallic component decontamination and conditioning in storage facilities 1 &#038; 3 (2005).<\/li>\n<li>Decommissioning, decontamination, cutting and conditioning of reactor internals; subcontractor to Westinghouse (2011 &#8211; 2013).<\/li>\n<li>Cutting and segmentation reactor vessel head CRDM tubes.\u00a0 Planning and assistance to the internals segmentation.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-4141\" src=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/07\/Jose_Cabrera_1-300x253.jpg\" alt=\"Jos\u00e9 Cabrera\" width=\"237\" height=\"200\" srcset=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/07\/Jose_Cabrera_1-300x253.jpg 300w, https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2025\/07\/Jose_Cabrera_1.jpg 528w\" sizes=\"(max-width: 237px) 100vw, 237px\" \/>\u00a0 \u00a0 \u00a0 \u00a0 <img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-4146\" src=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2023\/07\/Imagen8-300x225.webp\" alt=\"jose cabrera gdes\" width=\"263\" height=\"197\" \/>\u00a0 \u00a0 \u00a0 <img decoding=\"async\" class=\"alignnone wp-image-4148\" src=\"https:\/\/ingmark.com\/corporate\/wp-content\/uploads\/sites\/3\/2023\/07\/Imagen9.webp\" alt=\"desmantelamiento gdes\" width=\"315\" height=\"196\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Metallic component decontamination and conditioning in storage facilities 1 &#038; 3 (2005). Decommissioning, decontamination, cutting and conditioning of reactor internals; subcontractor to Westinghouse (2011 &#8211; 2013). Cutting and segmentation reactor vessel head CRDM tubes.\u00a0 Planning and assistance to the internals segmentation. &nbsp; \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0<\/p>\n","protected":false},"author":7,"featured_media":4142,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[53,55],"tags":[],"class_list":["post-4140","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyectos-general","category-proyectos-servicios-nucleares"],"_links":{"self":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/4140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/comments?post=4140"}],"version-history":[{"count":7,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/4140\/revisions"}],"predecessor-version":[{"id":4153,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/4140\/revisions\/4153"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/media\/4142"}],"wp:attachment":[{"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/media?parent=4140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/categories?post=4140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ingmark.com\/corporate\/en\/wp-json\/wp\/v2\/tags?post=4140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}